Committee Notes

In this log the most recent entry is at the top.  The oldest is at the bottom

 

Date: 02/26/09 17:33:06
Subject: RE: Civil association
 
I'll wait to see the thought and opinions from the other committee members.
 
Regards
 
Sergio
 
 
From: mike@crashteams.com
To: sergioeichner@hotmail.com; sara@sarabecker.com; petesmith@mcdowellrice.com; jmarizcuren@verizon.net; jorgeagnesi@prodigy.net.mx
Subject: RE: Civil association
Date: Thu, 26 Feb 2009 01:31:32 -0800

 

Sergio,

 

On the electrical and engineering issues – we are simply being pro-active and will not interfere in anything. The issue around electricity is really about information. We simply do not have the details we need as owners, and perhaps we can obtain more details in a non-confrontational and non-interfering way. I will be cautious and note your concerns. However, my feeling is that we were not being informed properly about the electricity ( maybe even misinformed ) and that we, as owners are at risk. At the same time, in fairness to the developer, we do not want to be demanding him to install the power supply without knowing if that is a reasonable demand.  On the engineering, Kurt was very informative as he is a developer and delivers condo projects in Canada. He is simply saying that we should begin collecting information now, as it is a very long and arduous task, and sooner is better than later. On a legal front, I agree, it is too soon but in terms of information gathering, it cannot hurt at all. I appreciate your points but when you see Kurt’s notes, you will see more clearly the issues.

 

The biggest issue is definitely the options regarding who should own the civil association the relationship between the owners, and Alarmen.

 

I am concerned instinctively when Alarmen comes to the meeting with 4 people, and produces insufficient financial information. They are not doing a good job at the Peninsula, only an adequate job and the only way I can see to improve that is to change the relationship to one where we are the administrators, we sign checks, and they must come to us for all payments over a certain amount or simply all checks. Only when we that kind of relationship can we properly control everything. In the meeting yesterday, the group was strongly in favour of the last option. Many of the people were quite strong on that point.

 

ON the issue of committee members living here, that is something to consider going forward. Having folks living here on the committee would be very helpful, if it is possible. I am only here from Nov to May, and perhaps somebody else is here May to November or several people. I know there are several people living here Nov to May who would be on the committee if asked, and who have some experience in these matters. That is not to say we should not also have committee members who do not live here, just some additional ones for control if we move to option 2. Thoughts.......

 

I think this is an excellent exchange of information and respectful debate and would like to continue. I am also very grateful to you for contributing your ideas and thoughts and certainly hope I am coming across with respect and an open mind. My intention is to assist and help.

 

 

 

Mike Kennedy

CEO


toll free (877) 372 3728

fax (250) 372 3814
mobile: (
250) 574-2531
www.crashteams.com


This e-mail is intended only for the person to whom it is addressed (the "addressee") and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use that a person other than the addressee makes of this communication is prohibited and any reliance or decisions made based on it, are the responsibility of such person. We accept no responsibility for any loss or damages suffered by any person other than the addressee as a result of decisions made or actions taken based on this communication or otherwise. If you received this in error, please contact the sender and destroy all copies of this e-mail.



 

 

From: sergio eichner [mailto:sergioeichner@hotmail.com]
Sent: February-25-09 11:32 PM
To: mike@crashteams.com; Sara Becker; Pete Smith; Jack Arizcuren; Jorge Agnesi
Subject: RE: Civil association

 

Hi all! answers in between:
 


From: mike@crashteams.com
To: sergioeichner@hotmail.com; sara@sarabecker.com; petesmith@mcdowellrice.com; jmarizcuren@verizon.net; jorgeagnesi@prodigy.net.mx
Subject: RE: Civil association
Date: Wed, 25 Feb 2009 19:10:56 -0800

Thanks Sergio. What I am not really clear about is the involvement of the present administration in the civil association. I though the idea was to form our civil association so we can have better control of the Alarmen group. As you say, they are very nice etc but not really transparent to us, and attempting to run a very profitable business. I thought if our civil association was “ arms length “ from Alarmen then Alarmen would have to be much more transparent and we would have a business relationship that put us in charge of them.

I think we need to go step by step otherwise things could go out of control, If we would be leaving full time in Peninsula I do agree that the owners of the civil association should be the homeowners, (this is exactly how we have it in the association we have in my home in Mexico city but we al leave here), the main reason is the signing of all documents, (checks, bank accounts, contracts, etc.), which would be difficult when none of the committee members are in Vallarta, BUT I think we have 2 options here: 1.- Let Alarmen be the owners and responsible of the association and ask them to sign an administration contract with tower 3 committee that would give us the power over them since we would be the ones signing it as proprietors. 2.- We would be the sole owners of the association not any person from Alarmen and just give them signing rights to sign checks and daily stuff. Opinions?
Regarding transparency and information needed, I think it is just a little time since we start working as a committee and they all ready started responding to us, so far they have been improving their communications and time responses we just need to let them know exactly what it is that we want and how often.

 

I also agree our one voice should be the current group or committee and I assume that I am now part of that committee. I do NOT want to be in charge, and leave that to you. However, the reason I took the recent initiative is because nothing was happening and I would really like to see some action moving forward steadily.

I do not know about others but I have no problem you or anybody else joining the committee. I do not see my self as being in charge of the committee or anything, it is just that I speak spanish and a little english so it was natural that I would do the talking but please forgive me if at some point I abuse from the language issues, it was never my intention.
I do think things were happening, it was only in late December that the committee was formed and we all ready had a working meeting, receive all the balances for 2008 and 2009 budget, (still need to be analyzed and discus, I all ready started hopefully tomorrow I will translate and send you the email, all ready shared it with Jorge), we have Sara's web page with allot of useful information, Pete manage to get the lawsuit, etc. of course there is always room for improvement and even more room at initial stages but we are going fw and a very important thing is that until now it has been done without any confrontation with the developer. Also we should not forget that we all have things to do in our own countries, homes and businesses but we are going forward I think.

 

Until yesterday’s meeting, most people were completely in the dark. The meeting accomplished a lot just in terms of informing the group. I will continue to move things forward and inform everyone of everything – and keeping the committee in place. As far as I am concerned anyone who volunteers to help should be involved as we need all the help and energy we can get.

I agree and the more truthful information we can get and post the better.

 

I am in the process of drafting the initial letter to Alarmen and the developer outlining the concerns of our group. We reached a consensus on safety issues yesterday and it is very timely to report those concerns now. I am going to share  the draft letter with everyone, before sending it on.

Please do so and I hope this doesn't sound wrong but keep in mind that things works differently in different countries and in Mexico not because we think the developer needs to put railings, just as an example, in certain parts of the building means that he must do it, he could very easily say that is not part of the project and that's it... it is the must common argument all developers use:) so what I think is that we should come up with a list of requirement and during a meeting we should asked them to fulfill the list as much as possible and we negotiate from there.

 

Yesterday’s meeting was very positive and I received many emails today from people expressing gratitude for being informed.

 

I do not know who else in the committee is living here all the time but would like whoever is to email me and confirm.

I wish:)

 

Tomorrow morning I am meeting Eduardo, and an electrical engineer about the looming electrical power issue. Following that meeting, we plan a meeting with the electrical company to get to the bottom of this issue and find out all the information. Obviously, we cannot accept delivery of a building without sufficient power, and a large expense to correct the issue following our acceptance.

I think speaking of delivery of the building is way to soon, they cannot deliver the building if they do not have the condominium regime therefore we still have another 6 or 10 plus months to think about that. My opinion when we'll reach that point most likely would be to hire a professional company to inspect the building completely and issue a professional opinion and base on that we ask the developer to execute all the pending issues, (we should be doing this along with tower 2 and depending on the timing with tower 1 as well since the common areas are the same to everyone and we could split the costs).
One very important thing in my opinion is not to interfere with the developer negotiations with the electricity company at this point nor with the municipal government directly regarding the lawsuit, we should give the developer time to resolve all this. 2009 is a mid term elections and I think they will occur next July so before that it is risky to do any moves because you can end up in no mans land if you know what I mean:)

 

I am also working with OUR structural engineer, Kurt  on the start of a due diligence plan in anticipation of the process of delivery so we fully understand the issues well in advance.

Same as above.

 

Everything that I am doing will be fully reported to everyone, and documented. If there is anything else I can do to assist, let me know and I will begin it.

Mike I also read the minute from the meeting of 24-02 and maybe I did not explain my self properly regarding the taxes, I'm not saying we should pay the 150,000 pesos as we speak, what I meant was that in my personal opinion I would agree to that but we will do what the majority decides, I specifically said to Alejandro that when the time comes for that we will negotiate but that in the mean time they should keep paying all the taxes to which he agreed.
 
Regards and sorry for the length of the email.
 
Sergio

 

Thanks

 

Mike

 

Mike Kennedy

mobile: (250) 574-2531
www.crashteams.com


This e-mail is intended only for the person to whom it is addressed (the "addressee") and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use that a person other than the addressee makes of this communication is prohibited and any reliance or decisions made based on it, are the responsibility of such person. We accept no responsibility for any loss or damages suffered by any person other than the addressee as a result of decisions made or actions taken based on this communication or otherwise. If you received this in error, please contact the sender and destroy all copies of this e-mail.

 

 

From: sergio eichner [mailto:sergioeichner@hotmail.com]
Sent: February-25-09 4:59 PM
To: mike@crashteams.com; Sara Becker; Pete Smith; Jack Arizcuren; Jorge Agnesi
Subject: RE: Civil association

 

Hi all!
 
Please see below an email that I receive today from Mike, I also send Mike the upside and downside regarding the civil association that I sent you so he will be in the same channel.
 
Good that everyone agrees to form the civil association, the committee thinks that way to, today I received confirmation from everyone. I will look forward to see the minute from the meeting to incorporate everyone's concerns into the agenda however I think we should have only 1 voice and 1 channel of communication either with the administration and developer as well and so far I think it should be the committee that was conformed during the December meeting in which the administration and developer were present. (if any one thinks differently it is fine with me), also remember that when the association will be up and running we will have an official homeowners meeting and the official committee should be elected.
 
Per the only 1 issue as downside from the civil association that I could think of, we would not be the owners so we are not the ones who will need to incorporate it, it should be Fernando and his team and rest assure they want this as well. It was his idea to form it in the first place and I know that he all ready started the process of incorporate it, he ask the permission for the name to the secretary of the exterior in Mexico....(it is regular paperwork to incorporate any company, association, cooperative, etc... in Mexico).
 
any comments?
 
regards
 
Sergio
 


From: mike@crashteams.com
To: sergioeichner@hotmail.com
Subject: Civil association
Date: Wed, 25 Feb 2009 08:02:04 -0800

Hi Sergio,

 

To bring you up to date on the meeting of the 24th I will send you and all the others the meeting minutes.

 

However, we did pass a motion to form a Civil Association. I understand you wish to be involved and perhaps take the lead on this process.

 

If you are too busy I would be happy to contact a PV Notario Publico and start the process.

 

Please let me know. Everyone is very anxious to move forward on this process immediately, for many important reasons.

 

Thanks

 

Mike

 

Mike Kennedy

CEO


toll free (877) 372 3728

fax (250) 372 3814
mobile: (
250) 574-2531
www.crashteams.com


This e-mail is intended only for the person to whom it is addressed (the "addressee") and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use that a person other than the addressee makes of this communication is prohibited and any reliance or decisions made based on it, are the responsibility of such person. We accept no responsibility for any loss or damages suffered by any person other than the addressee as a result of decisions made or actions taken based on this communication or otherwise. If you received this in error, please contact the sender and destroy all copies of this e-mail.

 Condo regime master (Spanish)

 Civil Association (spanish)

Copy of report of Tower III (Spanish)

Inspection Report of condo estimate (Spanish)

 

Meeting 2 20 2009 with developer and committee response

CONDOMINIO ESPECÍFICO RESIDENCIAL PENÍNSULA TORRE III.
Minute of the meeting of 20-02-2009.
Attendance:
- Homeowners.
• Sergio Eichner. Condo 19-A.
• Mina Fox. Condo 06-D.
• Jack, Janice Arizcuren Condo 08-B.
• Michael James Kennedy Condo 14-D.
- Administration Alarmen S.C.
• Lic. Fernando Alarcon M.
• Lic. Roberto Perez O.
• Srita. Cecilia Delgado.
Legal Department.
• Lic. Agustin Medina.
- Accounting Firm Vibeva S.C.
• C.P. Víctor Bernal V.
- Developer.
• Arq. Alejandro Báez.
- Sales Agency Lemmus.
• Sr. Alberto Lemmus.
Points Discussed.
Administration.
􀂃 Regulations: Regulations were installed in common areas in 2 languages, it is being handed over to every owner extracts of the condominium regulations on the use of common areas in each department and finally will be sent by mail the complete version of the regulations digitalized. The owners requested to the Administration to be strict and follow all the rules without exception.
􀂃 Civil Asociation: It is proposed to form a civil asociation in order to give legal personality to the building, it was agreed to review the proposal by the committee and send to the owners the project for an approval (Requesting the administration bond work). The Administration will send the proposal in English too.
􀂃 Insurance policy: The building is now insured against fire, contained fire, earthquake, civil liability, glass, crossed liability, the building is not insured against hydrometeorological phenomenons, it was agreed to change the beneficiary name on behalf of the Trust Bansi SA and analyze the content to endorse the departments to share the sum insured.
􀂃 Grills: It was agreed to enforce regulations where it is prohibited to have grills on the balconies or terraces, Administration will request to remove the grills and to comply with this provision from the regulations, the condos who won’t take the grills out, all services will be restricted until they comply with the regulations.
􀂃 Pets: Administration will demand to the owners which have some kind of animals to follow the regulations of the condominium which says as follows: it must bring a leash when taken out to the common areas, pets can not get in the pool, the owners must clean all dirt from the animal, owners may only have pets of adequate size, the owners will be responsible for acts that disturb other owners (noise, smells, etc), pets can not be left tied to a tree or lamp while the owners take sun or are into the pool.
􀂃 Shower at the beach: the Administration informed that in the next few days will be installed a shower next to the stairway at the beach in condominium.
􀂃 Stairs at the pool: It was agreed to install a staircase inside the pool at the Torre III area.
Accounting. The accountant Victor Bernal delivered the financial statements of the building from April to December 2009, those statements were:
􀂃 Statement of income and expenditures.
􀂃 Details of expenditure.
􀂃 Status of fees collection until December 31st , 2008.
􀂃 Statement of the reserve fund.
􀂃 Operating Budget 2009.
􀂃 Detailed operation budeget 2009.
􀂃 List of 2009 maintenance fees.
These financial statements will be sent by e-mail to every owner. The homeowners may also ask the Administration for a printed copy of them. After this information is reviwed, the owners will request all changes needed to make it easier to understand. The Administration will get a credit card terminal for Torre III.
Developer.
􀂃 Arrangement in apartments: Arq. Alejandro Baez said the developer has been repairing the flaws inside the apartments but they had been unable to move as quickly as they wish because most of the owners do not live in Puerto Vallarta. They ask all the homeowners to notice the date of arrival to facilitate arrangements pending in
􀂃 their apartments. It was further agreed to hire by the developer a person attending such arrangements and who speaks English and Spanish. Arrangements pending: air conditioning, toilets, kitchen tarja slack key, handles and locks at the backsatirs, spa, audio system in lobby and more umbrellas in the second row of deckchairs.
􀂃 Titles (Escrituras): Arq. Baez said that the legal process is between the Hotels Association of Vallarta against the City Hall (past Administration), which is currently under the stage of “Amparo” and their lawyers estimate to conclude the case in about 6 months. The Amparo state does not interrupt the process of construction and sales of the development, he also mentioned that the development of the condominiums regime is almost finished and the City Hall is about to deliver the final approval. The owners requested a letter in which the Developer makes a commitment to solve this problem and respond for all consequences and costs of this litigation, in addition to the commitment to deliver all titles, this letter would be delivered on March 15, 2009.
􀂃 Property Tax: was proposed that payment of this tax was made proportionately by the owners, which is based on physical delivery of the apartments, Arq. Baez mentioned that the current value of the tax payment is considered as land and it is much cheaper than if were divided as apartments, and the approximate annual payment would be $ 150,000 pesos for the whole building. (This proposal will be assessed by the hoemowners). Even though the owners will analyze this proposal, in the meantime the owners does not have to decide anything until they are able to get the apartments titles, meanwhile is responsibility of the developer to cover such payments.
􀂃 Electricity: Arq. Baez mentioned that they have to make a connection that comes from the electric station from the Fraccionamiento Fluvial at a distance of approximately 2 kilometers. This job must be done by the Grand Venetian, Icon and Peninsula. This job is authorized by CFE (Electric Company) and was mentioned that is a matter of time for their solution. The developer
􀂃 made a commitment to provide enough electrical capacity to cover 100% the needs of the Tower.
􀂃 Delivery of the building: It was mentioned that the delivery and assurance of furniture and equipment will be from the establishment of the condominiums regime. It must be scheduled a meeting to conduct the official inspection and delivery of the condominium for which the homeowners will ask an external firm to coordinate what it needs to make a document for the Towers delivery.
􀂃 Common Areas: In the upcoming days, the developer will finish the pending installations in common areas, which is to connect the sound for the lobby and the operation of spas. Also to finish the work at the pool area.
Without any other theme to discuss, the meeting was over around 22.30 hours.
21-02-2008
Administration.
Alarmen S.C.
Lic. Fernando Alarcón M.
 

 

From: sergio eichner

Date: 02/21/09 07:11:47
To: Sara Becker; Pete Smith; Jack Arizcuren; Jorge Agnesi
Subject: FW: Póliza de Seguro Torre III
 
Hi all!
 
Just a quick email to let you know that the meeting took place yesterday from 6:30 to 10 pm, from the homeowners side there was Jack, Janice and myself from the committee and Doris Fox and Mike Kennedy that asked to be present and from the developer and administration side there was Alejandro Baez, Alberto Lemmus, Fernando Alarcon, Roberto  and Cecilia the accountant and attorney which I do not remember their names. (Fernando will prepare the minute in english, I asked him to do it as soon as possible).
 
I think that the meting went well, as always they are saying that they are responsible for everything and that they will resolve either the titles problematic as well as the problems inside the units. We also went over the property taxes and civil association option in order to take control of the administration soon instead of wait for the condominium regime that will take them another 6 plus months to finish.
 
I do not have enough time right now but will send a more detail email regarding each topic soon as well as the official minute that Fernando will prepare.
 
Finally attach is the insurance policy that Fernando send me and after this email I will fw another email that Fernando sent.
 
Regards
 

Sergio

From: sergio eichner
Date: 02/21/09 07:16:22
To: Sara Becker; Pete Smith; Jack Arizcuren; Jorge Agnesi
Subject: FW: informacion
 
Attach are 5 files, I know they are all in spanish but I just wanted to share with you everything I've been receiving.
 
1.- Master condominium regime.
2.- Accounting information as of December 31st, 2008
3.- Quotation for an independent engineer to verify both towers before we receive them officially from the developer
4.- Proposed civil association
5.- Rules and regulation for the condominium
 
Regards
 
Sergio
 
 

Date: Fri, 20 Feb 2009 17:31:35 -0600
Subject: informacion
From: fernando.alarcon@alarmen.com.mx
To: sergioeichner@hotmail.com

Estimado Sergio por este medio te envio la siguiente informacion:

-  Regimen de Condominio Maestro.
-  Estados financieros al 31 de dic del 2008.
-  Propuesta para la revision del edificio por parte de un Ingeniero.
-  Propuesta de asociacion civil.
-  Reglamento del condominio.

si ocupas alguna otra informacion estoy a tus ordenes, saludos.

 

 

From: sergio eichner
Date: 02/16/09 08:31:19
To: Pete Smith; Sara Becker; Jack Arizcuren; Jorge Agnesi
Subject: RE: Tower 3 Titles
 
Got it, it is rather long but I'll do my best but this week I'm all day with my kids so will hardly find the time but will keep you posted.
 
Regards
 
Sergio

 

 

From: Pete Smith
Date: 02/16/09 06:42:04
To: sergio eichner; Sara Becker; Jack Arizcuren; Jorge Agnesi
Subject: Tower 3 Titles


Attached is the COURT DECISION that was handed down on November 28, 2008. It is thirty pages long, legal size paper, and is written in Spanish [of course]. Maybe Sergio can translate it for us (if that is time-consuming, I’ll see what I can do here). I think this is an IMPORTANT DOCUMENT that may shed some light on the title problems.



Pete



Pete Smith

 

From: sergio eichner
Date: 02/16/09 08:31:19
To: Pete Smith; Sara Becker; Jack Arizcuren; Jorge Agnesi
Subject: RE: Tower 3 Titles
 
Got it, it is rather long but I'll do my best but this week I'm all day with my kids so will hardly find the time but will keep you posted.
 
Regards
 
Sergio
 

 

 

 

From: Roberto Perez

Date: 01/14/09 12:44:30
To: jorgeagnesi@prodigy.net.mx; sergio eichner; sara@sarabecker.com; petesmit@mcdowellrice.com; jmarizcuren@verizon.net; Fernando Alarcon
Subject: Fwd: Comité/Committe
 
(CORRECCIÓN TORRE III)

Estimado Comité,
 
Por medio de la presente queremos desearles un feliz año 2009, y al mismo tiempo informarles que en la Administración de Península
Torre III estamos trabajando para enviarles toda la información requerida por ustedes, en los próximos días se las enviaremos. Estamos esperando la revisión y cierre del 2008. Estaremos en contacto con ustedes.
 
Saludos cordiales.
 
 
(CORRECTION TORRE III)
Dear Committe,
 
We want to wish you a happy 2009, also to inform you that Peninsula
Torre III's Administration is working to send all the information requested by you, in the next few days we will send it. We are waiting for the review and closing of 2008. We will be in touch with you.
 
Best Regards.

 

 

 

 

 

 

 

What lies underneath here is the original set of emails.  Above this line will be the most recent emails

Sarah,

I can confirm that previous title commitments issued upon Peninsula have not revealed any of the issues to which you refer to in your attached email. The  title commitment for your property is presently being authorized by the Underwriter and will be available for your disclosure shortly.

With respect to any future potential permit discrepancies, these would be highlighted upon issuance, or lack of, of the condominium regime.  

As ever my best regards, Kevin.

Kevin Crisp

Business Development Manager

Stewart Title Puerto Vallarta

Title Insurance, Escrow, Closing Coordination, Residential Loan Services

 

Mexico Line: 322 209 1483

US Line: 713 271 5453

Website: www.stewartlat.com

 
 
Dear Sergio
 
I really appreciate you being a part of the committee and the others as well Pete Smith 10D and Jorge Agnes 3B, and Jack and Janice Arizcuren 8B
 
The ability to speak Spanish is a real  asset and I am working on it.
 
I am grateful for all who participated on December 29. 
 
I will try and finalize the email list this weekend after I get home tomorrow
 
My deepest thanks for all your help
------Original Message-------
 
 
Dear members of the committee
 
It seems they have tried to demonstrate some good faith in the short time span all this came up
 
It will be important to have written agreements that the items they are stating particularly on the taxes.
 
I have a question about  the reserve funds. When I bought my condo no statement about reserve funds were mentioned nor were they in the contract according to my lawyer.  This seems to be with 50% occupancy of the two towers given about 100 units at average of $1500 US Dollars about 1.5 million dollar slush fund. Even at 3 percent interest this is a loan of $45,000 UD dollars free loan and lost opportunity cost for us.   Who collects the interest and where is the accounting. I think this should be specifically addressed. If it is legally required by Mexican law as I was told by CC I would like to see the statute.
 
I am wondering about the validity of the titles for tower I given the present circumstances.  I hope to have a title report from Stuart title in the next two weeks.  I will pass on what I find out
 
I would hope to press for dates on the items Sergio covered.  I am beholden to you for your work. 
 
I am concerned that if we are too considerate of their desires not to relay information to the rest of the owners until they are ready , that we will be indirectly contributing to the persistent confusion and frustration that prompted the meeting on the Dec 27.  I would hope not to be viewed with suspicion by the rest of the community. Since we have no real legal standing I am not sure we can consent to be secretive. Transparency is a major factor as is rapid dissemination of information
I would very much like to publish Sergios findings for the rest of the homeowners.  It is a balancing act. 
 
The success of all this depends on the combined knowledge and wisdom of all of us. 
 
I hope to be in PV in Feb 14-20
 
With Deep Respect
Sara
 

 

 
Date: 12/30/08 15:07:32
Subject: Committee
 
Sara:
 
Hi!
 
Just wanted to let you know that yesterday I met with Alejandro Baez the legal representant for the developer and today I just met with the owners of the administration company and Roberto as well so I would very much want to tell everyone in the committee what they have said and to agree for next steps so whenever you have the time please send me the e-mail addresses from all of us and will send the update.
 
Regards and have a safe flight back home.
 
Sergio Eichner
Apt. 19-A
 
From: sergio eichner <mailto:sergioeichner@hotmail.com>
Date: 01/03/09 20:07:11
Subject: RE: Committee
 
 
Hi everyone!
 
 
 
The same day of the meeting I receive a call at night from Marineus saying that Felipe Tome, the developer would not be able to meet the next day with us but that Arq. Alejandro Baez who is the legal representant for Felipe would be able to meet that same night, (Marineus tried to reach Sara without success and did not have the others names and units numbers, neither did I), but to make long story short I did meet with Alejandro and the next day with Fernando Alarcon who is the owner of the administration company, (Roberto's boss), and what I said to both of them was that during the homeowners meeting there were 3 streams that I could sense and they were:
 
 
 
1.- Title of the condos.
 
2.- Administration and reserve fees and the proper use of this funds.
 
3.- Proper functionality and full delivery of the equipments inside the units from the developer side: toilet seats, air conditioning, kitchen faucets, electricity capacity, proper termination of the building and its warranties as well as the rules and regulations for homeowners.
 
I must say that both of them were very responsive, committed with the full termination of the building and so far very willing to work with us and provide any and all the information we need and deserve as owners, of course one thing is to say it and another is to do it but I guess at this point we need to decide what we need from them to prepare and ask for it and see what they come back with.
 
 
 
1.- There is a lawsuit from the hotel association of Puerto Vallarta against the local government because of all the new condominium towers, not only Peninsula, and the truth is that they haven't been able to come to a figure that all parties are satisfied with so each side is playing towards its best interest and so far from what they said Felipe is trying to resolve it but might wait until the change of the governor early this year.
 
Alejandro said that the time frame for us to be able to start getting our titles is from 4 to 6 months but my personal guess is that it will occur sometime during the second semester of 2009. The good thing is that they will take responsibility of all the taxes until that happens, I specifically asked Alejandro this and he said they will pay for them, (I think we should ask him to put this in writing just in case:). Another thing I wanted to say is that in Mexico whenever anyone wants to sell any property that property needs to be free of any duties, taxes, etc. we called it Spanish "libre de gravamenes" and this means that not only it is good that they accept that they will pay for the taxes until we receive the titles but that it is their legal obligation to do so.
 
There was this other thing that I felt awkward so I did ask Alejandro that I did not understand how it is possible that with this lawsuit from the hotel association they are issuing the titles for tower 2 and he said that regardless of the lawsuit they are moving forward with the titles for tower 2 and that they will do the same with tower 3 but the risk in doing this is that per the lawsuit they need to modify anything from the legal documents that they use for the titles then the titles will need to be reissue and that costs money but since tower 2 is being deliver for over 1.5 years they needed to start but that he thinks that for the time the legal papers for the titles of tower 3 will be ready the new governor will be in place and hopefully all this nonsense will be finished. (Alejandro thinks that because of this lawsuit the legal papers are taking much more time than they should and mainly is because it is the same local government that needs to sign those papers).
 
Finally regarding this point we need to formally ask Alejandro that he elaborate a document that we all feel comfortable with all this information to send it to all the homeowners.
 
 
 
2.- Administration fees and etc. they both agree that it was a mistake not having a formal meeting during this days but Fernando said that they will elaborate a balance sheet with all the accounting information in order for us the revised it and after that sending to all the homeowners.
 
 
 
3.- Regarding the toilet seats, a/c, Faucets, they will fix them at their own expenses but I think we need to ask for a formal termination date otherwise it could take forever. Regarding rules and regulations they said that they were working on these documents to deliver to homeowners but unfortunately they haven't finish preparing but hopefully some time soon they will. Regarding warranties for the building equipments Alejandro said that when the time comes we will need to seat and come to an agreement using common sense! They insist that they are not going anywhere until they finish all the pending issues and also because they have another year to go before they finish tower 1:)
 
 
 
Sorry for the length of this mail but so far this is everything I recall from the meetings, of course they asked me not to share this information outside the committee until we have the final papers that we all feel comfortable sharing with everybody.
 
 
 
Next steps? I suggest we formally asked them to prepare the documents for the 3 streams with dates and everything and we start from there!
 
 
 
Any comments? Ideas? Questions?
 
 
 
I will be in Puerto Vallarta from the 15th of February to the 21st in case anyone will be there we can have a small working session with Alejandro and Fernando
 
 
 
Regards
 
 
 
Sergio
 
 
 
________________________________
 
From: sergio eichner [mailto:sergioeichner@hotmail.com]
Sent: Sun 1/4/2009 11:39 PM
Subject: RE: Committee
 
 
Hi all!
 
1.- The mexican law for condominiums does establish that we need to have in the bank account a reserve fund, (do not recall exactly but I think it is a minimum of 3 months of maintenance fee), that money should be in the condominium account and the interest must be credited to our account. This exactly was one of the issues regarding the monthly fees and reserve funds and proper use of the monies, I specifically ask Fernando and he says that the account is under the name of a person who works with the developer but that we have full control of that account??, this sound awkward to me but the truth is until we do not have the legal personality under the mexican law we cannot open a bank account in our name.
Regarding this I told them that we should use the bank account of tower 2 or even open a new account under their name which is much better to have the account under a developers person.
 
2.- I think the titles they are issuing for tower 2 are valid unless the results of the lawsuit would be against us and / or require a change in the legal papers.
 
3.- I do agree that transparency and timely delivering of all information is critical so what I suggest, if everyone agrees, is that we give them the benefit of the doubt and we send them an email asking for the information they want to share with everyone and we give them a week or up to 10 days at the most to prepare it and if we are not satisfied with what they come back with then we send everything that we know to everyone.
 
I'm receiving a notification from Jorge Agnes e-mail that it cannot be delivered so we might have he e-mail wrong.
 
Regards
 
Sergio

 

 

 
 
Dear members of the committee
 
It seems they have tried to demonstrate some good faith in the short time span all this came up
 
It will be important to have written agreements that the items they are stating particularly on the taxes.
 
I have a question about  the reserve funds. When I bought my condo no statement about reserve funds were mentioned nor were they in the contract according to my lawyer.  This seems to be with 50% occupancy of the two towers given about 100 units at average of $1500 US Dollars about 1.5 million dollar slush fund. Even at 3 percent interest this is a loan of $45,000 UD dollars free loan and lost opportunity cost for us.   Who collects the interest and where is the accounting. I think this should be specifically addressed. If it is legally required by Mexican law as I was told by CC I would like to see the statute.
 
I am wondering about the validity of the titles for tower I given the present circumstances.  I hope to have a title report from Stuart title in the next two weeks.  I will pass on what I find out
 
I would hope to press for dates on the items Sergio covered.  I am beholden to you for your work. 
 
I am concerned that if we are too considerate of their desires not to relay information to the rest of the owners until they are ready , that we will be indirectly contributing to the persistent confusion and frustration that prompted the meeting on the Dec 27.  I would hope not to be viewed with suspicion by the rest of the community. Since we have no real legal standing I am not sure we can consent to be secretive. Transparency is a major factor as is rapid dissemination of information
I would very much like to publish Sergios findings for the rest of the homeowners.  It is a balancing act. 
 
The success of all this depends on the combined knowledge and wisdom of all of us. 
 
I hope to be in PV in Feb 14-20
 
With Deep Respect
Sara
 

From: sergio eichner [mailto:sergioeichner@hotmail.com]
> Sent: Sun 1/4/2009 11:39 PM
> To: sara@sarabecker.com; jmarizcuren@verizon.net
> Cc: Pete Smith; jorgeagnes@prodigy.net.mx
> Subject: RE: Committee
>
>
> Hi all!
>
> 1.- The mexican law for condominiums does establish that we need to have in the bank account a reserve fund, (do not recall exactly but I think it is a minimum of 3 months of maintenance fee), that money should be in the condominium account and the interest must be credited to our account. This exactly was one of the issues regarding the monthly fees and reserve funds and proper use of the monies, I specifically ask Fernando and he says that the account is under the name of a person who works with the developer but that we have full control of that account??, this sound awkward to me but the truth is until we do not have the legal personality under the mexican law we cannot open a bank account in our name.
> Regarding this I told them that we should use the bank account of tower 2 or even open a new account under their name which is much better to have the account under a developers person.
>
> 2.- I think the titles they are issuing for tower 2 are valid unless the results of the lawsuit would be against us and / or require a change in the legal papers.
>
> 3.- I do agree that transparency and timely delivering of all information is critical so what I suggest, if everyone agrees, is that we give them the benefit of the doubt and we send them an email asking for the information they want to share with everyone and we give them a week or up to 10 days at the most to prepare it and if we are not satisfied with what they come back with then we send everything that we know to everyone.
>
> I'm receiving a notification from Jorge Agnes e-mail that it cannot be delivered so we might have he e-mail wrong.
>
> Regards
>
> Sergio
>
Subject: RE: Committee
> Date: Mon, 5 Jan 2009 08:40:39 -0600
> From: petesmith@mcdowellrice.com
> To: sergioeichner@hotmail.com; sara@sarabecker.com; jmarizcuren@verizon.net
> CC: jorgeagnesi@prodigy.net.mx
>
> Hello:
>
> Your email address for jorge was wrong. I put the correct one above.
>
> My report and thoughts are as follows:
>
> 1. I talked with Jorge after he talked with Felipe and then I talked directly with Felipe myself. In those conversations I was told that the Puerto Vallarta government is denying a "permit" to Towers 3 and 1 that is necessary in order to convey residential deeds to the owners. Felipe said that we qualify for the permit, which should cost him a very nominal sum but that the Mayor is demanding the sum of $2 Million U.S. Dollars for the permit. He said that the Grand Venitian is in the exact same situation. Conchas Chinas [spelling?] was also in the same positon but that it got its permit last week. He said that Icon Vallarta has its permit because, at the beginning of construction, it put up some sort of a bond.
>
> 2. Felipe said he and Grand Venitian were continuing to work with the local government in hopes of resolving the situation and the back up plan would be to file a suit in Federal Court to require the local government to issue the permit. Felipe said he had done everything to qualify for the permit and it was not right that it was being refused.
>
> 3. In either event, I get the idea that it may be a long process and that, at present, there is NO solution.
>
> 4. If we get "deeds" in the interim before the permit is issued, I do not think they will be valid and when we try to resell the problem will still exist. Thus, before. re we all become "appeased" with paperwork and deeds, we must verify that the permit has been issed and the deeds are valid. I assume that Stewart Title will not issue title policies if there is a problem with the permitting process that is required for the deeds to be valid. I, like Sarah, am going to get title insurence throught Stewart Title so that should let us know tif there is a problem once we finally get deeds and paperwork from the developer.
>
> 5 After I talked to Felipe, I talked to a local Mexican lawyer and got a different story as to the permit and why it was refused to us. She said that the Federal Court in Guadalupe had issued an order revoking our status as residential properties and that, under that order, and that the Mayor would not even have the power to give us the permit at present. It had something to do with the devloper not complying with certain requirements before beginning construcftion. She said the Icon Vallarta was not subject to it because Icon Vallarta had complied with whatever the requirements are. She is going to send me a copy of the order so we can see once and for all what it says. [However, it is written in Spanish and someone will need to transalte it for us.] When I get the order, I will email it to the Committee. I have not checked the reliability of this information and it may be wrong, but I wanted to pass it on to the Committe members; once we get the alleged Court order, we can determine whether the lawyer's comments were accurate or not.
>
> AS A RESULT OF THE ABOVE, THE FOLLOWING ARE MY SUGGESTIONS FOR WHAT WE DO AT PRESENT:
>
> 1. We should post on Sara's website [or email to the owners who gave us email addresses] a communication that states we have talked direcftly to the develper who advises the delay in closing results from the refusal of the local government to issue a permit. We should advise that the develper is working diligently to solve the problem and hopes to have it solved during 2009.
>
> 2. We should should provide the information in Sergio's email.
>
> 3. Finally, we should advise them that we are independently going to try to determine what the problem in the permitting process stems from and that we will provide a follow up email when we determine what it is and what the solution might be. I agree with Sara that we shold not create any panic a this point because we do not have all of the facts. Before we get all of the facts we should not cause undue concerns but, on the other hand, we should not create the impression that everything is okay either.
>
> Pete Smith

 
Hi all!
 
After reading Pete's email the pieces of the puzzle are starting to fell in their place.....
Alejandro did mention that they had an issue with the paperwork for tower 3 and 1 but that it was a technicality and that they were working on them but he never mention that the permit was all ready denied nor revoked. Hi did mention that the governor was asking for allot of money but did not say the amount. Alejandro also said that Icon Vallarta had a different kind of problem but that they still had some problems with the permits...
I'm sure Felipe will do whatever needs to be done in order to truly fix the problem since the other way, (lawsuit with all the homeowners from T-3 and T-1), will cost him much more and is able to face legal charges so then again I'm positive that he will resolve the problem he just needs time.
 
I agree with Pete's suggestion 1, 2 and 3 and from my side I will send an e-mail to Alejandro asking that he put in writing that they will take care of the taxes until they are able to issue the titles, another e-mail to Fernando asking for a statement up to date with all the financial information and finally another email to Alberto Lemmus and Marineus asking for a time frame for all the works to be completed. (I will always copy the committee members).
I will wait until tomorrow afternoon before sending the emails in case anyone has a comment or suggestion.
 
Regards
 
Sergio
 
 
 
 
To all
 
My apologies for the email address on Jorge.  it was the one I had written down.
 
This is an intriguing part of the committee work in that we need to meld ideas into one reasonable approach.
 
I have sent the following email to Kevin at Stewart Title
 
"
Dear Kevin
 
I was in PV over Christmas and met with several homeowners in the development as well as the realtor Alberto Lemus.
I have heard several rumors of problems with the permit for the development from the government in Puerto Vallarta and in the Federal Court in Guadalupe revoking the permit for the condos from the developer.
 
In your title report have you uncovered any problems ?
 
With respect
 
Sara"
 
Since I have paid for a title report hopefully this may yield some information.  It is an added expense but I think given the circumstances ,Title Insurance is a must.  If they issue a policy, there must be reasonable basis for doing so.  If things go south with the governments it is their dime.  They have a real estate lawyer in the office.  A deed without all the permits in place will complicate inheritance and selling of a condo.
 
The reserve account seems necessary.  I am curious as to the oversight and the accounting. My experience with my checks with the former administration and present one do not give me comfort that accounting will be accurate or verifiable without effort on our part.   I would like to pass on the owners that they get and keep receipts for everything  If we do not have a legal residence it may be hard to the Tower 3 to have a bank account.  I think it could lead to confusion to mingle it with Tower 2.  They have expressed through some of their members that they wish to be independent of us which could be both good and bad.
 
I am in favor of publishing the notes from Sergio and Pete.    The major question is the timing as the developer through his legal representative has asked for some time for information to be more defined.  I would be in favor of a reasonable deadline and communication with the Felipe that we are under some moral obligation to keep those that appointed us informed. We must be very careful to distill fact from rumor.  There is the moral quandary of how much unverified rumor we pass on to the other owners.   Misinformation seems to be a bane already.  At some point it may be necessary to hire an attorney to investigate but I would be interested in Stewart Titles assessment.  When I signed my contract I had a real estate lawyer who is on my web site < Mr  Gustavo Calderon who did a preliminary title search and he did not find anything wrong but things can change.
 
I don't have the email list yet from Janet but hopefully soon.  I have been working and on call and have not had time to do all the email addresses yet.   I do have the hard copy I took at the meeting.
 
I would like to hear from Jorge, Jack and Janice as to their assessment.
 
I appreciate all the time this is taking but clearly we need to look out for ourselves and others. 
Considering the short time all this started about a week ago I am encouraged that we will get some solutions.
 
With Deep Respect
 
sara 
 
From: JORGE
Date: 01/06/09 09:15:53
Subject: RE: Committee
 
SARA, 
 I  GOT YOUR E MAIL, I HAVE NOT  FIND NOTHING TO REPORT,  I WILL KEEP TRYNG,   IF YOU WANT ME TO LOOK INTO SOMETHING YOU WANT TO FIND OUT  LET ME  KNOW.
 
SALUDOS
 
GRACIAS   
 
 JORGE AGNESI
 

 

lejandro:

 A

Hola!

 

Dando seguimiento a la platica que tuvimos en Puerto Vallarta en Diciembre así como a platicas que sostuvieron otros miembros del comité directamente con Felipe también en Diciembre te comento que hemos hablado entre nosotros y mas o menos tenemos la historia de la situación de torre 3 en lo que a la escrituración se refiere y nos hemos puesto de acuerdo por lo que te pido que por favor nos mandes un escrito lo mas detallado posible el cual podamos compartir con todos los propietarios de la torre 3 y haciendo mucho hincapié en que ustedes se harán responsables de todos los impuestos hasta que estén en posibilidad de escriturar nuestros departamentos, así mismo que nos des un tiempo aproximado y lo mas realista posible de cuando creen que puedan arreglar todos los problemas y estar en condiciones de escriturar los departamentos ya que no queremos crear falsas expectativas con el resto de los propietarios.

 

Por ultimo te comento que pretendemos mandar este escrito lo antes posible por lo que te pido de la manera mas atenta lo elabores a la mayor brevedad para que a mas tardar la próxima semana ya estemos en posibilidades de enviarlo.

 

Ojala nos puedas mandar el correo electrónico de Felipe para estar copiándolo en estos correos.

 

 

For the committee:

 

As agreed, I ask Alejandro to prepare the report that we have talked about regarding an explanation for the home owners about the status of the titles for our units, I asked him to emphasize on the issue that they will take care of the taxes until they resolve the problems and they are in position to issue the titles as well as a realistic time frame so everyone will know what to expect and when.

I said that we are expecting to send this report by the end of next week at the most and that hopefully he would provide Felipe’s e-mail so we can include him in our future communications.

 

Regards

 

Committee Tower 3

 

 
 

Fernando:

 

Hola!

 

Como te comente por teléfono los miembros del comité ya hemos hablado entre nosotros y nos hemos puesto de acuerdo y te queremos pedir que prepares un estado de resultados lo más actualizado y detallado posible en el que se incluyan entre otras cosas, (seguro que el contador sabrá mejor todos los detalles que se deben incluir):

 

1.- Relación de ingresos por cuotas de mantenimiento.

2.- Relación de departamentos que ya fueron entregados y que NO están pagando su cuota de mantenimiento mensual.

3.- Relación de departamentos que no han sido entregados o vendidos por lo que la constructora es responsable de pagar dichas cuotas de mantenimiento.

4.- Relación de cuotas para fondos de reserva, quien la ha pagado y donde esta ese dinero.

5.- Saldos en chequeras, cuentas de inversión e intereses recibidos.

6.- Relación de gastos mensuales.

7.- Presupuesto para el 2009

8.- Reglamento del condominio

9.- Póliza de seguro

 

 

Así mismo ver que planes tienes para:

 

Plan para cobrar a los departamentos morosos.

Plan para manejar los recursos del edificio hasta que se tenga personalidad legal ya que esto puede tardar y no nos gustaría tener que seguir depositando las cuotas de mantenimiento a nombre de alguien del desarrollador.

 

Nos gustaría poder mandar toda esta información al resto de los propietarios lo mas pronto posible por lo que te pedimos nos des un estimado de los tiempos.

 

Saludos

 

Comité torre 3

 

 

For the committee:

 

As agreed, I asked Fernando from the administration company to prepare a balance sheet of tower 3 including among other things:

 

Incomes from monthly fees, what units are paying and which units are delinquent in their assessments as well as a relation of units that haven’t been delivered or sold so the developer would need to cover for those monthly fees.

Regarding the reserve fund which units have paid and where is that money.

Balance in our check books and investment accounts and interests earned if any..

Breakdown for our monthly expenses.

Budget for 2009.

Rules and regulations.

Insurance policy.

 

I said that we would like to send this information to everyone as soon as possible so that we would like a time frame to start receiving this information.

 

Regards

 

Committee Tower 3

 
 

 

Alberto / Marineus:

 

Hola!

 

Les comento que ya nos hemos puesto de acuerdo en el comité y según acordamos en la pasada junta de Diciembre les pedimos que por favor nos den un listado de las cosas que deben de arreglar y/o terminar de la torre 3 así como un calendario realista con el que se comprometan a terminar ya que no queremos que esto se haga demasiado largo y tedioso.

Algunas de las cosas que se hablaron en la junta, que nos han mencionado en la administración y que hemos detectado son las siguientes sin embargo estamos seguros de que ustedes deben de tener una lista mas completa:

 

1.- Escusado, (esto urge).

2.- Aires acondicionados.

3.- Llave de agua floja de las cocinas.

4.- Capacidad eléctrica para la torre 3, ya sea por fallas o falta de equipos, detalles de instalación o incrementar el contrato con la compañía de luz. (la razon no importa el caso es que deben de terminar con este problema y poder tener la carga suficiente para todo el edificio).

5.- Bisagras o brazos cierra puertas y chapas de todas las puertas de servicio de todos los pisos de la torre. (faltan chapas, las bisagras y brazos no sirven y según nos comento la administración es un defecto de toda la torre y serian cambiados por la constructora).

6.- Elevadores.

 

Por favor queremos enviar esta información a todos los propietarios a mas tardar la próxima semana por lo que les pedimos nos manden este plan de trabajo a la brevedad.

 

Saludos

 

Comité torre 3

 

For the committee

 

As agreed I’m asking Alberto and Marineus to give us a time frame for the entire pending problems that the developer needs to fix so we can inform all the home owners what to expect and when. Than we want to send this information to everyone by the end of next week so we kindly ask them to send this information as soon as possible:

 

Among other things we have the following list but surely they would have a more complete one:

 

Toilet seats

Air conditioning

Kitchen faucet, (it is loose).

Electricity capacity, whether it is equipment, installation or the supply contract with the electric company we need to have this resolved so the entire building will be able to operate normally.

Hinge, locks and etc for the service doors that per the administration comments they need to be change.

Elevators.

 

Regards

 

Committee tower 3

 
 
Date: 01/08/09 05:41:36
Subject: RE: Committee
 
 
I think you should also publish the email from Stewart Title.

 

From: Sara Becker. MD [mailto:sara@sarabecker.com]
Sent: Wed 1/7/2009 11:27 PM
To: Pete Smith; jmarizcuren@verizon.net; sergio eichner
Cc: jorgeagnesi@prodigy.net.mx
Subject: RE: Committee

 
 
Per Sergio's and Petes suggestions I would like to post the information below and from Sergio on the website
There has been a technical delay in getting the email list done (hopefully completed by Sunday)
 
I will wait until tomorrow to hear from everyone.  If there are no objections I will publish the information below and in Sergio email on the web site
 
Best wishes.
 
sara 
 
Date: 01/08/09 06:53:18
Subject: RE: Committee
 
 Agree.
 
Regards
 
Sergio
 


>

Date: 01/09/09 10:23:30
Subject: RE: FW: Peninsula
 

Sara,

All information either provided to date, or to be provided within your title commitment, is yours to utilize as you feel appropriate.

Kind regards, Kevin.

Kevin Crisp

Business Development Manager

Stewart Title Puerto Vallarta

Title Insurance, Escrow, Closing Coordination, Residential Loan Services

 

Mexico Line: 322 209 1483

US Line: 713 271 5453

Website: www.stewartlat.com

 

Confidentiality Warning: This e-mail and its attachment contain information intended only for the use of the individual entity named above.  If the reader of this e-mail is not intended recipient or the employee or agent responsible for delivering it to the intended recipient, any total or partial dissemination, publication or copying, of this e-mail is strictly prohibited. If you have received this e-mail in error, please immediately notify us by return e-mail.

Advertencia: Esta comunicación y sus anexos contienen destinada únicamente para la persona o entidad arriba indicada. si usted no es el destino del mismo, o empleado o agente responsable del envío a dicho destinatario, cualquier divulgación, publicación o copia, total o parcialmente su contenido es estrictamente prohibida.  si usted ha recibido este correo por error, por favor notifíquenos de inmediato mediante devolución al remitente.

Stewart Title Latin America or its subsidiary Stewart Title Puerto Vallarta does not have a license granted by the Mexican government and is not subject to supervision by Mexican financial regulators to sell mortgage brokerage services. The Mortgage Alliance Program (MAP) is not affiliated with Stewart Information Services Corporation, Stewart Title Guaranty Company or any of their subsidiaries and affiliates.Stewart Title Latin America ó su subsidiaria Stewart Title Puerto Vallarta no tiene una licencia otorgada por el gobierno de México y no está sujeta a la supervisión de Reguladores Financieros mexicanos para la correduría de hipotecas. El Mortgage Alliance Program no está afiliado a Stewart Information Servicies Corporation, Stewart Title Guaranty Company ó alguna de sus subsidiarias ó afiliadas.

 

From: Sara Becker. MD [mailto:sara@sarabecker.com]
Sent: Friday, January 09, 2009 10:16 AM
To: Kevin Crisp
Subject: Re: FW: Peninsula

 

 

Am I allowed to pass your findings on to other condo owners in the building

They are most anxious and I suspect are also going to get title ins if they know about it

 

With respect

 

sara 

 

-------Original Message-------

 

Date: 01/07/09 15:32:30

Subject: FW: Peninsula

 

Sarah,

I can confirm that previous title commitments issued upon Peninsula have not revealed any of the issues to which you refer to in your attached email. The  title commitment for your property is presently being authorized by the Underwriter and will be available for your disclosure shortly.

With respect to any future potential permit discrepancies, these would be highlighted upon issuance, or lack of, of the condominium regime.  

As ever my best regards, Kevin.

Kevin Crisp

Business Development Manager

Stewart Title Puerto Vallarta

Title Insurance, Escrow, Closing Coordination, Residential Loan Services

 

Mexico Line: 322 209 1483

US Line: 713 271 5453

Website: www.stewartlat.com